Substation Scout

tap Rosharon - Winmil substation interconnection queue

3 active projects totaling 358 MW in the ERCOT queue.

3 ERCOT queue filings name tap Rosharon - Winmil as the point of interconnection, all in Brazoria County, TX.

Target commercial operation dates as filed run from Aug 2027 to Aug 2028 (3 filings). 3 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Rock N’ Roll Solar, LLC (3 filings).

3active projects
358active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
24INR0235 Rock N' Roll Storage Two 138 206 Battery SS Completed, FIS Started, No IA Aug 2027
24INR0041 Rock N' Roll Solar SLF 138 152 Solar SS Completed, FIS Started, No IA Aug 2027
24INR0234 Rock N' Roll Storage SLF 138 0 Battery SS Completed, FIS Started, No IA Aug 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Brazoria County, TX

All 63 ERCOT queue filings in Brazoria County, TX.