tap Rosharon - Winmil substation interconnection queue
3 active projects totaling 358 MW in the ERCOT queue.
3 ERCOT queue filings name tap Rosharon - Winmil as the point of interconnection, all in Brazoria County, TX.
Target commercial operation dates as filed run from Aug 2027 to Aug 2028 (3 filings). 3 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Rock Nā Roll Solar, LLC (3 filings).
3active projects
358active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 24INR0235 | Rock N' Roll Storage Two | 138 | 206 | Battery | SS Completed, FIS Started, No IA | Aug 2027 |
| 24INR0041 | Rock N' Roll Solar SLF | 138 | 152 | Solar | SS Completed, FIS Started, No IA | Aug 2027 |
| 24INR0234 | Rock N' Roll Storage SLF | 138 | 0 | Battery | SS Completed, FIS Started, No IA | Aug 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Brazoria County, TX
- Tap Savana to Seabreeze - Ckt 27: 3 active, 809.8 MW of 3 filed
- Angleton: 2 active, 635.5 MW of 2 filed
- TNMP FM524 Substation: 2 active, 622 MW of 2 filed
- Tap SANBER_POI_8 (Bus# ) to WEST COLUMBIA (Bus# ) Ckt 60 Line: 2 active, 100.2 MW of 2 filed
- Tap Angleton - Clute: 2 active, 0 MW of 2 filed