Substation Scout

Austin Bayou Solar

ERCOT queue ID 25INR0102

Austin Bayou Solar (25INR0102) is listed in the ERCOT interconnection queue as a 502.5 MW solar project in Brazoria County, TX. The filing names Tap Savana to Seabreeze - Ckt 27 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of June 1, 2029. It records the screening study as complete on September 21, 2022 and the interconnection agreement as signed on November 15, 2023.

Queue ID25INR0102
Project nameAustin Bayou Solar
Status (as published)SS Completed, FIS Started, IA
SubstationTap Savana to Seabreeze - Ckt 27
Point of interconnectionTap 345 kV Savana 43180 to Seabreeze 43020 - Ckt 27
CountyBrazoria
StateTX
Voltage345 kV
Capacity502.5 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-06-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap Savana to Seabreeze - Ckt 27 substation: 3 requests in the ERCOT queue, 3 active totaling 809.8 MW.

Queue IDProjectMWResourceStatus
25INR0237Austin Bayou Storage III156.6BatterySS Completed, FIS Started, IA
25INR0235Austin Bayou Storage I150.7BatterySS Completed, FIS Started, IA

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityAustin Bayou Solar, LLC
CDR reporting zoneCOASTAL
Fuel codeSOL
Technology codePV
Interconnection agreement signed2023-11-15
Screening study complete2022-09-21
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first