Substation Scout

Austin Bayou Solar

ERCOT queue ID 25INR0102

Queue ID25INR0102
Project nameAustin Bayou Solar
Status (as published)SS Completed, FIS Started, IA
SubstationTap Savana to Seabreeze - Ckt 27
Point of interconnectionTap 345 kV Savana 43180 to Seabreeze 43020 - Ckt 27
CountyBrazoria
StateTX
Voltage345 kV
Capacity502.5 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2027-06-01
Source datasetlarge

Additional filed fields

Interconnecting EntityAustin Bayou Solar, LLC
Cdr ZoneCOASTAL
Fuel CodeSOL
Technology CodePV
Ia Signed45245
Screening Study Complete44825
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.