Austin Bayou Storage I
ERCOT queue ID 25INR0235
Austin Bayou Storage I (25INR0235) is listed in the ERCOT interconnection queue as a 150.7 MW battery project in Brazoria County, TX. The filing names Tap Savana to Seabreeze - Ckt 27 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of June 1, 2029. It records the screening study as complete on June 5, 2023 and the interconnection agreement as signed on February 14, 2025.
| Queue ID | 25INR0235 |
|---|---|
| Project name | Austin Bayou Storage I |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Tap Savana to Seabreeze - Ckt 27 |
| Point of interconnection | Tap 345 kV Savana 43180 to Seabreeze 43020 - Ckt 27 |
| County | Brazoria |
| State | TX |
| Voltage | 345 kV |
| Capacity | 150.7 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-06-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Tap Savana to Seabreeze - Ckt 27 substation: 3 requests in the ERCOT queue, 3 active totaling 809.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 25INR0102 | Austin Bayou Solar | 502.5 | Solar | SS Completed, FIS Started, IA |
| 25INR0237 | Austin Bayou Storage III | 156.6 | Battery | SS Completed, FIS Started, IA |
Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Austin Bayou Solar, LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2025-02-14 |
| Screening study complete | 2023-06-05 |
| Air permit | Not Required |