DAMAZO (Second Division) SOLAR

ERCOT queue ID 20INR0248

DAMAZO (Second Division) SOLAR (20INR0248) is listed in the ERCOT interconnection queue as a 100.2 MW solar project in Brazoria County, TX. The filing names Tap SANBER_POI_8 (Bus# ) to WEST COLUMBIA (Bus# ) Ckt 60 Line as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of December 31, 2025. It records the screening study as complete on June 18, 2019, the full interconnection study as approved on October 28, 2022 and the interconnection agreement as signed on October 14, 2020.

Queue ID20INR0248
Project nameDAMAZO (Second Division) SOLAR
Status (as published)SS Completed, FIS Completed, IA
SubstationTap SANBER_POI_8 (Bus# ) to WEST COLUMBIA (Bus# ) Ckt 60 Line
Point of interconnectionTap 138 kV SANBER_POI_8 (Bus# 43110) to WEST COLUMBIA (Bus# 43380) Ckt 60 Line
CountyBrazoria
StateTX
Voltage138 kV
Capacity100.2 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2025-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap SANBER_POI_8 (Bus# ) to WEST COLUMBIA (Bus# ) Ckt 60 Line substation: 2 requests in the ERCOT queue, 2 active totaling 100.2 MW.

Queue IDProjectMWResourceStatus
25INR0378Second Division Storage0BatterySS Completed, FIS Started, No IA

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityTX Gulf Solar 1 LLC
CDR reporting zoneCOASTAL
Fuel codeSOL
Technology codePV
Interconnection agreement signed2020-10-14
Screening study complete2019-06-18
Full interconnection study approved2022-10-28
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.