Substation Scout

Pisgah Ridge Solar 2

ERCOT queue ID 24INR0086

Pisgah Ridge Solar 2 (24INR0086) is listed in the ERCOT interconnection queue as a 101.9 MW solar project in Navarro County, TX. The filing names Tap Navarro - Limestone as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of March 31, 2029. It records the screening study as complete on October 7, 2021.

Queue ID24INR0086
Project namePisgah Ridge Solar 2
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Navarro - Limestone
Point of interconnectionTap 345kV 68091 Navarro - 46020 Limestone
CountyNavarro
StateTX
Voltage345 kV
Capacity101.9 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-03-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap Navarro - Limestone substation: 2 requests in the ERCOT queue, 2 active totaling 203.3 MW.

Queue IDProjectMWResourceStatus
24INR0087Pisgah Ridge Storage 3101.4BatterySS Completed, FIS Started, No IA

Navarro, TX: 29 requests in the ERCOT queue, 26 active totaling 4,412.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityPisgah Ridge Solar 2, LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2021-10-07
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first