4 active projects totaling 1,044.3 MW in the ERCOT queue.

4 ERCOT queue filings name Tap Angstrom - Grissom as the point of interconnection, all in San Patricio County, TX.

Target commercial operation dates as filed run from Oct 2028 to Dec 2029 (4 filings). 4 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Vaquero Solar, LLC (1 filing), Gulf Gateway Solar, LLC (1 filing), Gulf Gateway Storage, LLC (1 filing), Diamond B Storage, LLC (1 filing).

4active projects
1,044.3active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
26INR0211 Titus Low Carbon Ventures Solar 1 345 338 Solar SS Completed, FIS Started, IA Oct 2028
27INR0492 Gulf Gateway Solar One 345 301.4 Solar SS Completed, FIS Started, No IA Dec 2029
27INR0556 Gulf Gateway Storage One 345 301.4 Battery SS Completed, FIS Started, No IA Dec 2029
26INR0428 Diamond Cowboy Storage 345 103.5 Battery SS Completed, FIS Started, IA Oct 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in San Patricio County, TX

All 28 ERCOT queue filings in San Patricio County, TX.