Goddard substation interconnection queue
3 active projects totaling 677.7 MW in the ERCOT queue.
3 ERCOT queue filings name Goddard as the point of interconnection, all in San Patricio County, TX.
Target commercial operation dates as filed run from Sep 2028 to May 2029 (3 filings). 3 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Ferrovial Energy US 1 (1 filing), Bayou Creek Solar LLC (1 filing), Aurora Solar LLC (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 29INR0227 | San Patricio Energy Center BESS | 345 | 300.8 | Battery | SS Completed, FIS Started, No IA | Mar 2029 |
| 28INR0223 | Bayou Creek Solar | 345 | 256.9 | Solar | SS Completed, FIS Started, IA | Sep 2028 |
| 22INR0392 | Kalina Solar | 345 | 120 | Solar | SS Completed, FIS Started, No IA | May 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | 28INR0223 | Capacity revised | +1.4 | SS Completed, FIS Started, IA → SS Completed, FIS Started, IA |
Same name on other Substation Scout pages
Other sources that print a substation named “Goddard” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.
Other ERCOT queue substations in San Patricio County, TX
- Tap Angstrom - Grissom: 4 active, 1,044.3 MW of 4 filed
- Tap Angstrom – Naismith: 2 active, 565.1 MW of 2 filed
- KATOEN (Bus#): 2 active, 557.9 MW of 2 filed
- Tap Grissom – Lon C Hill: 2 active, 447.5 MW of 2 filed
- Bus # Haisley 4A: 2 active, 207.9 MW of 2 filed