Goddard substation interconnection queue

3 active projects totaling 677.7 MW in the ERCOT queue.

3 ERCOT queue filings name Goddard as the point of interconnection, all in San Patricio County, TX.

Target commercial operation dates as filed run from Sep 2028 to May 2029 (3 filings). 3 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Ferrovial Energy US 1 (1 filing), Bayou Creek Solar LLC (1 filing), Aurora Solar LLC (1 filing).

3active projects
677.7active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
29INR0227 San Patricio Energy Center BESS 345 300.8 Battery SS Completed, FIS Started, No IA Mar 2029
28INR0223 Bayou Creek Solar 345 256.9 Solar SS Completed, FIS Started, IA Sep 2028
22INR0392 Kalina Solar 345 120 Solar SS Completed, FIS Started, No IA May 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-0528INR0223Capacity revised+1.4 SS Completed, FIS Started, IA → SS Completed, FIS Started, IA

Same name on other Substation Scout pages

Other sources that print a substation named “Goddard” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other ERCOT queue substations in San Patricio County, TX

All 28 ERCOT queue filings in San Patricio County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first