Substation Scout

Tap Grissom – Lon C Hill substation interconnection queue

2 active projects totalling 447.5 MW in the ERCOT queue.

2active projects
447.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0132 Palo Verde Wind 345 297.5 Wind SS Completed, FIS Started, IA
27INR0227 PALO VERDE BESS 345 150 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.