Tap Grissom – Lon C Hill substation interconnection queue
2 active projects totaling 447.5 MW in the ERCOT queue.
2 ERCOT queue filings name Tap Grissom – Lon C Hill as the point of interconnection, all in San Patricio County, TX.
Target commercial operation date as filed: Jul 2029 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: RWE Clean Energy Development, LLC (2 filings).
2active projects
447.5active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 27INR0132 | Palo Verde Wind | 345 | 297.5 | Wind | SS Completed, FIS Started, IA | Jul 2029 |
| 27INR0227 | PALO VERDE BESS | 345 | 150 | Battery | SS Completed, FIS Started, No IA | Jul 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in San Patricio County, TX
- Tap Angstrom - Grissom: 4 active, 1,044.3 MW of 4 filed
- Goddard: 3 active, 677.7 MW of 3 filed
- Tap Angstrom – Naismith: 2 active, 565.1 MW of 2 filed
- KATOEN (Bus#): 2 active, 557.9 MW of 2 filed
- Bus # Haisley 4A: 2 active, 207.9 MW of 2 filed
Site Scanner