Substation Scout

KATOEN (Bus#) substation interconnection queue

2 active projects totaling 557.9 MW in the ERCOT queue.

2 ERCOT queue filings name KATOEN (Bus#) as the point of interconnection, all in San Patricio County, TX.

Target commercial operation date as filed: Mar 2029 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Indigo Solar, LLC (2 filings).

2active projects
557.9active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
28INR0179 Sunburst Solar n/r 301.6 Solar SS Completed, FIS Started, No IA Mar 2029
28INR0181 Sunburst BESS n/r 256.3 Battery SS Completed, FIS Started, No IA Mar 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in San Patricio County, TX

All 28 ERCOT queue filings in San Patricio County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first