KATOEN (Bus#) substation interconnection queue
2 active projects totaling 557.9 MW in the ERCOT queue.
2 ERCOT queue filings name KATOEN (Bus#) as the point of interconnection, all in San Patricio County, TX.
Target commercial operation date as filed: Mar 2029 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Indigo Solar, LLC (2 filings).
2active projects
557.9active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 28INR0179 | Sunburst Solar | n/r | 301.6 | Solar | SS Completed, FIS Started, No IA | Mar 2029 |
| 28INR0181 | Sunburst BESS | n/r | 256.3 | Battery | SS Completed, FIS Started, No IA | Mar 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in San Patricio County, TX
- Tap Angstrom - Grissom: 4 active, 1,044.3 MW of 4 filed
- Goddard: 3 active, 677.7 MW of 3 filed
- Tap Angstrom – Naismith: 2 active, 565.1 MW of 2 filed
- Tap Grissom – Lon C Hill: 2 active, 447.5 MW of 2 filed
- Bus # Haisley 4A: 2 active, 207.9 MW of 2 filed