Titus Low Carbon Ventures Solar 1

ERCOT queue ID 26INR0211

Titus Low Carbon Ventures Solar 1 (26INR0211) is listed in the ERCOT interconnection queue as a 338 MW solar project in San Patricio County, TX. The filing names Tap Angstrom - Grissom as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of October 16, 2028. It records the screening study as complete on January 10, 2024 and the interconnection agreement as signed on May 26, 2026.

Queue ID26INR0211
Project nameTitus Low Carbon Ventures Solar 1
Status (as published)SS Completed, FIS Started, IA
SubstationTap Angstrom - Grissom
Point of interconnectionTap 345kV 8249 Angstrom - 8624 Grissom
CountySan Patricio
StateTX
Voltage345 kV
Capacity338 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-10-16
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap Angstrom - Grissom substation: 4 requests in the ERCOT queue, 4 active totaling 1,044.3 MW.

Queue IDProjectMWResourceStatus
27INR0492Gulf Gateway Solar One301.4SolarSS Completed, FIS Started, No IA
27INR0556Gulf Gateway Storage One301.4BatterySS Completed, FIS Started, No IA
26INR0428Diamond Cowboy Storage103.5BatterySS Completed, FIS Started, IA

San Patricio, TX: 28 requests in the ERCOT queue, 27 active totaling 6,857.5 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityVaquero Solar, LLC
CDR reporting zoneCOASTAL
Fuel codeSOL
Technology codePV
Interconnection agreement signed2026-05-26
Screening study complete2024-01-10
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.