Tap Angstrom – Naismith substation interconnection queue
2 active projects totalling 565.1 MW in the ERCOT queue.
2active projects
565.1active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 25INR0081 | SanPat Solar I | 345 | 308.9 | Solar | SS Completed, FIS Completed, IA |
| 25INR0052 | SanPat Solar II | 345 | 256.2 | Solar | SS Completed, FIS Completed, IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.