Tap Angstrom – Naismith substation interconnection queue
2 active projects totaling 565.1 MW in the ERCOT queue.
2 ERCOT queue filings name Tap Angstrom – Naismith as the point of interconnection, all in San Patricio County, TX.
Target commercial operation date as filed: Jul 2027 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Padre Solar LLC (1 filing), CGRP 04, LLC (1 filing).
2active projects
565.1active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 25INR0081 | SanPat Solar I | 345 | 308.9 | Solar | SS Completed, FIS Completed, IA | Jul 2027 |
| 25INR0052 | SanPat Solar II | 345 | 256.2 | Solar | SS Completed, FIS Completed, IA | Jul 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in San Patricio County, TX
- Tap Angstrom - Grissom: 4 active, 1,044.3 MW of 4 filed
- Goddard: 3 active, 677.7 MW of 3 filed
- KATOEN (Bus#): 2 active, 557.9 MW of 2 filed
- Tap Grissom – Lon C Hill: 2 active, 447.5 MW of 2 filed
- Bus # Haisley 4A: 2 active, 207.9 MW of 2 filed