Substation Scout

Bus # Haisley 4A substation interconnection queue

2 active projects totaling 207.9 MW in the ERCOT queue.

2 ERCOT queue filings name Bus # Haisley 4A as the point of interconnection, all in San Patricio County, TX.

Target commercial operation date as filed: Jul 2029 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Vaquero II Solar LLC (1 filing), Vaquero II Storage LLC (1 filing).

2active projects
207.9active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
28INR0305 Iron Cowboy Solar 138 144.6 Solar SS Completed, FIS Started, IA Jul 2029
28INR0306 Iron Cowboy Storage 138 63.3 Battery SS Completed, FIS Started, IA Jul 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Tracked changes at this substation

2 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-09-0728INR0305Status changen/a SS Completed, FIS Started, No IA → SS Completed, FIS Started, IA
2026-09-0728INR0306Status changen/a SS Completed, FIS Started, No IA → SS Completed, FIS Started, IA

Other ERCOT queue substations in San Patricio County, TX

All 28 ERCOT queue filings in San Patricio County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first