Felix West Solar (27INR0012) is listed in the ERCOT interconnection queue as a 185 MW solar project in Wilbarger County, TX. The filing names Riley as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of June 16, 2028. It records the screening study as complete on April 14, 2023 and the interconnection agreement as signed on February 21, 2025.

Queue ID27INR0012
Project nameFelix West Solar
Status (as published)SS Completed, FIS Started, IA
SubstationRiley
Point of interconnection6101 Riley 345 kV
CountyWilbarger
StateTX
Voltage345 kV
Capacity185 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-06-16
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Riley substation: 3 requests in the ERCOT queue, 3 active totaling 1,042.5 MW.

Queue IDProjectMWResourceStatus
22INR0497TEXPO680GasSS Completed, FIS Started, No IA
22INR0209Felix North Solar177.5SolarSS Completed, FIS Started, IA

Wilbarger, TX: 24 requests in the ERCOT queue, 21 active totaling 8,450.9 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-09 Capacity revised −16 SS Completed, FIS Started, IA → SS Completed, FIS Started, IA

Full change log →

Additional filed fields

Interconnecting entityFelix 1, LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Interconnection agreement signed2025-02-21
Screening study complete2023-04-14
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first