Felix West Solar
ERCOT queue ID 27INR0012
Felix West Solar (27INR0012) is listed in the ERCOT interconnection queue as a 185 MW solar project in Wilbarger County, TX. The filing names Riley as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of June 16, 2028. It records the screening study as complete on April 14, 2023 and the interconnection agreement as signed on February 21, 2025.
| Queue ID | 27INR0012 |
|---|---|
| Project name | Felix West Solar |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Riley |
| Point of interconnection | 6101 Riley 345 kV |
| County | Wilbarger |
| State | TX |
| Voltage | 345 kV |
| Capacity | 185 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-06-16 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Riley substation: 3 requests in the ERCOT queue, 3 active totaling 1,042.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 22INR0497 | TEXPO | 680 | Gas | SS Completed, FIS Started, No IA |
| 22INR0209 | Felix North Solar | 177.5 | Solar | SS Completed, FIS Started, IA |
Wilbarger, TX: 24 requests in the ERCOT queue, 21 active totaling 8,450.9 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | Capacity revised | −16 | SS Completed, FIS Started, IA → SS Completed, FIS Started, IA |
Additional filed fields
| Interconnecting entity | Felix 1, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2025-02-21 |
| Screening study complete | 2023-04-14 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.