Substation Scout

Myrtle Solar

ERCOT queue ID 19INR0041

Myrtle Solar (19INR0041) is listed in the ERCOT interconnection queue as a 321.2 MW solar project in Brazoria County, TX. The filing names Angleton as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of June 21, 2027. It records the screening study as complete on April 28, 2017, the full interconnection study as approved on January 25, 2022 and the interconnection agreement as signed on November 13, 2019.

Queue ID19INR0041
Project nameMyrtle Solar
Status (as published)SS Completed, FIS Completed, IA
SubstationAngleton
Point of interconnection42110 Angleton 138kV
CountyBrazoria
StateTX
Voltage138 kV
Capacity321.2 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2027-06-21
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Angleton substation: 2 requests in the ERCOT queue, 2 active totaling 635.5 MW.

Queue IDProjectMWResourceStatus
27INR0636Myrtle Solar Repower314.3SolarSS Completed, FIS Completed, No IA

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityMyrtle Solar, LLC
CDR reporting zoneCOASTAL
Fuel codeSOL
Technology codePV
Interconnection agreement signed2019-11-13
Screening study complete2017-04-28
Full interconnection study approved2022-01-25
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.