Myrtle Solar Repower
ERCOT queue ID 27INR0636
Myrtle Solar Repower (27INR0636) is listed in the ERCOT interconnection queue as a 314.3 MW solar project in Brazoria County, TX. The filing names Angleton as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of June 21, 2027. It records the full interconnection study as approved on September 15, 2026.
| Queue ID | 27INR0636 |
|---|---|
| Project name | Myrtle Solar Repower |
| Status (as published) | SS Completed, FIS Completed, No IA |
| Substation | Angleton |
| Point of interconnection | 42110 Angleton 138kV |
| County | Brazoria |
| State | TX |
| Voltage | 138 kV |
| Capacity | 314.3 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-06-21 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Angleton substation: 2 requests in the ERCOT queue, 2 active totaling 635.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 19INR0041 | Myrtle Solar | 321.2 | Solar | SS Completed, FIS Completed, IA |
Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-05 | New request | 314.3 | Not reported → SS Completed, FIS Completed, No IA |
Additional filed fields
| Interconnecting entity | Myrtle Solar, LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | SOL |
| Technology code | PV |
| Full interconnection study approved | 2026-09-15 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.