Substation Scout

Victoria, TX interconnection queue

18 active projects totalling 5,412.2 MW in the ERCOT queue, plus 3 with terminal status (shown greyed).

18active projects
5,412.2active MW
21total filed
Queue IDProjectkVMWResourceStatus
33INR0007 Blue Energy Center - Phase 3 – Steam Stage 2 345 1,320 Nuclear SS Started, FIS Started, No IA
30INR0150 Blue Energy Center- Phase 1a - Gas 345 780 Gas SS Started, FIS Started, No IA
23INR0189 Bayside Solar n/r 508.9 Solar Inactive
24INR0237 Bayside BESS n/r 507.8 Battery Inactive
29INR0248 Blue Energy Center - Phase 1b – Steam 345 330 Gas SS Completed, FIS Started, No IA
26INR0028 HyFuels Calhoun Solar 345 301.8 Solar SS Completed, FIS Started, No IA
26INR0021 Crossroads Wind 138 277.4 Wind SS Completed, FIS Completed, IA
27INR0224 Leopard BESS 138 264.2 Battery SS Completed, FIS Started, IA
23INR0090 Iguala Solar 345 250 Solar SS Completed, FIS Started, IA
27INR0169 Marcos Solar SLF 138 216.1 Solar SS Completed, FIS Started, No IA
29INR0244 Oak Belt Storage 138 209.7 Battery SS Completed, FIS Started, No IA
27INR0382 Calico BESS 138 204.9 Battery SS Completed, FIS Started, No IA
28INR0356 Arpeggio BESS 138 200.7 Battery SS Completed, FIS Started, No IA
26INR0505 Goldhill Energy Storage 138 200.6 Battery SS Completed, FIS Started, No IA
29INR0243 Oak Belt Solar 138 181 Solar SS Completed, FIS Started, No IA
24INR0425 Two Brothers ESS 138 154.7 Battery SS Completed, FIS Started, IA
24INR0168 Tejano Storage 138 152.3 Battery SS Completed, FIS Started, No IA
23INR0342 Brizo BESS 138 144.2 Battery SS Completed, FIS Started, IA
27INR0170 Marcos BESS 138 115.9 Battery SS Completed, FIS Started, No IA
26INR0559 Georgia-Lynn BESS 138 108.7 Battery SS Completed, FIS Started, No IA
24INR0109 Oriana BESS n/r 60.3 Battery Inactive

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.