Goldhill Energy Storage (26INR0505) is listed in the ERCOT interconnection queue as a 200.6 MW battery project in Victoria County, TX. The filing names Tap VISTRON4B – TUNGSTEN4A as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 30, 2028. It records the screening study as complete on July 5, 2024.
| Queue ID | 26INR0505 |
|---|---|
| Project name | Goldhill Energy Storage |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap VISTRON4B – TUNGSTEN4A |
| Point of interconnection | Tap 138kV 8154 VISTRON4B – 8189 TUNGSTEN4A |
| County | Victoria |
| State | TX |
| Voltage | 138 kV |
| Capacity | 200.6 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-09-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Victoria, TX: 22 requests in the ERCOT queue, 17 active totaling 5,382.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Goldhill Energy Storage LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2024-07-05 |