Goldhill Energy Storage (26INR0505) is listed in the ERCOT interconnection queue as a 200.6 MW battery project in Victoria County, TX. The filing names Tap VISTRON4B – TUNGSTEN4A as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 30, 2028. It records the screening study as complete on July 5, 2024.

Queue ID26INR0505
Project nameGoldhill Energy Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationTap VISTRON4B – TUNGSTEN4A
Point of interconnectionTap 138kV 8154 VISTRON4B – 8189 TUNGSTEN4A
CountyVictoria
StateTX
Voltage138 kV
Capacity200.6 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-09-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Victoria, TX: 22 requests in the ERCOT queue, 17 active totaling 5,382.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityGoldhill Energy Storage LLC
CDR reporting zoneSOUTH
Fuel codeOTH
Technology codeBA
Screening study complete2024-07-05

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first