Substation Scout

Oak Belt Solar

ERCOT queue ID 29INR0243

Queue ID29INR0243
Project nameOak Belt Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap (Bus #) FURHMANSB8 - (Bus #‎) VANDERBLTSW8
Point of interconnectionTap 138 kV (Bus #5506) FURHMANSB8 - (Bus #‎5584) VANDERBLTSW8
CountyVictoria
StateTX
Voltage138 kV
Capacity181 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2029-10-15
Source datasetlarge

Additional filed fields

Interconnecting EntityOak Belt Solar, LLC
Cdr ZoneSOUTH
Fuel CodeSOL
Technology CodePV
Screening Study Complete46058
Air PermitNot Required
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.