Georgia-Lynn BESS
ERCOT queue ID 26INR0559
Georgia-Lynn BESS (26INR0559) is listed in the ERCOT interconnection queue as a 108.7 MW battery project in Victoria County, TX. The filing names CHOCBAYU4A as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of February 20, 2028. It records the screening study as complete on October 28, 2024.
| Queue ID | 26INR0559 |
|---|---|
| Project name | Georgia-Lynn BESS |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | CHOCBAYU4A |
| Point of interconnection | 80064 CHOCBAYU4A 138 kV |
| County | Victoria |
| State | TX |
| Voltage | 138 kV |
| Capacity | 108.7 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-02-20 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Victoria, TX: 22 requests in the ERCOT queue, 17 active totaling 5,382.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Georgia Lynn BESS LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2024-10-28 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.