Two Brothers ESS (24INR0425) is listed in the ERCOT interconnection queue as a 154.7 MW battery project in Victoria County, TX. The filing names BLKBYU4A as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of February 29, 2028. It records the screening study as complete on December 13, 2022 and the interconnection agreement as signed on April 22, 2024.

Queue ID24INR0425
Project nameTwo Brothers ESS
Status (as published)SS Completed, FIS Started, IA
SubstationBLKBYU4A
Point of interconnection8911 BLKBYU4A 138kV
CountyVictoria
StateTX
Voltage138 kV
Capacity154.7 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-02-29
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Victoria, TX: 22 requests in the ERCOT queue, 17 active totaling 5,382.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBRP Blue Topaz 2, LLC
CDR reporting zoneSOUTH
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2024-04-22
Screening study complete2022-12-13
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first