Burchess Hill
Named in 1 PJM planning document for 1 project, on December 5, 2023.
Same name on other Substation Scout pages
Other sources that print a substation named “Burchess Hill”. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Burchess Hill: Expansion Tracker, PJM planning: PJM system-wide state not printed
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
Part of a named transmission project: Brandon Shores deactivation upgrades ($1,513.96 million).
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| PJM recommended adjustments to Earlier Approved Brandon Shores De-Activation Scope B3780 |
Not printed | $60M | 2026-2028 | Not printed | 2023-12-05 TEAC |
Other substations in this project
“PJM recommended adjustments to Earlier Approved Brandon Shores De-Activation Scope” also names 13 other substations, with what the most recent document says about each.
- Batavia Rd. BGE New — “Build new Batavia Rd. 230 kV switching station” (p. 20)
- Brighton BGE Work described at it — “Install Statcom at Brighton 500 kV” (p. 21)
- Conastone BGE Work described at it — “Capacitors - 350 MVAR at Brighton 500 kV, 250 MVAR at Burchess Hill 500 kV, and 350 MVAR at Conastone 500 kV” (p. 21)
- Delta/Calpine BGE Not stated
- Graceton BGE New — “Build Graceton 500 kV substation” (p. 20)
- Granite BGE Work described at it — “Install Statcom at Granite 230 kV” (p. 21)
- North Delta BGE Work described at it — “Modify the planned North Delta 500/230 kV substation” (p. 20)
- Northeast BGE Not stated
- Peach Bottom BGE Expansion — “Expand Peach Bottom North yard” (p. 20)
- Peach Bottom North BGE New — “Build new Peach Bottom North - Graceton 500kV Line” (p. 21)
- Riverside BGE, MD Work described at it
- Solley BGE Work described at it — “Solley 230kV (+/- 350 MVAR)” (p. 21)
- West Cooper BGE New — “Cancel B3780.3 (Build 500/230 kV West Cooper substation)” (p. 20)
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2023-12-05 | TEAC Item 15 - Reliability Analysis Update 2022 Window 3 p. 21 |
PJM recommended adjustments to Earlier Approved Brandon Shores De-Activation Scope | “250 MVAR at Burchess Hill 500 kV” 500 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation", or when a PJM document prints a rename for the same project (src/ingest/rtepAliases.json; the entry lists its old names).
- role is "new" only where a cited document phrase calls the substation new, describes constructing it, or calls it proposed (graded by src/lib/roleBasis.js), "existing" where a phrase describes work at it, otherwise "unknown".
- expansion is set on a substation that is not "new" where a cited phrase describes a new voltage level, a new or expanded yard, bus or bay, or a named load connected to it (graded by src/lib/expansionBasis.js). It reproduces what the document describes and adds nothing to it.
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.