Brighton
Named in 1 PJM planning document for 1 project, on December 5, 2023.
Same name on other Substation Scout pages
Other sources that print a substation named “Brighton”. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
Part of a named transmission project: Brandon Shores deactivation upgrades ($1,513.96 million).
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| PJM recommended adjustments to Earlier Approved Brandon Shores De-Activation Scope B3780 |
Not printed | $60M | 2026-2028 | Not printed | 2023-12-05 TEAC |
Other substations in this project
“PJM recommended adjustments to Earlier Approved Brandon Shores De-Activation Scope” also names 13 other substations, with what the most recent document says about each.
- Batavia Rd. BGE New — “Build new Batavia Rd. 230 kV switching station” (p. 20)
- Burchess Hill BGE Work described at it — “250 MVAR at Burchess Hill 500 kV” (p. 21)
- Conastone BGE Work described at it — “Capacitors - 350 MVAR at Brighton 500 kV, 250 MVAR at Burchess Hill 500 kV, and 350 MVAR at Conastone 500 kV” (p. 21)
- Delta/Calpine BGE Not stated
- Graceton BGE New — “Build Graceton 500 kV substation” (p. 20)
- Granite BGE Work described at it — “Install Statcom at Granite 230 kV” (p. 21)
- North Delta BGE Work described at it — “Modify the planned North Delta 500/230 kV substation” (p. 20)
- Northeast BGE Not stated
- Peach Bottom BGE Expansion — “Expand Peach Bottom North yard” (p. 20)
- Peach Bottom North BGE New — “Build new Peach Bottom North - Graceton 500kV Line” (p. 21)
- Riverside BGE, MD Work described at it
- Solley BGE Work described at it — “Solley 230kV (+/- 350 MVAR)” (p. 21)
- West Cooper BGE New — “Cancel B3780.3 (Build 500/230 kV West Cooper substation)” (p. 20)
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2023-12-05 | TEAC Item 15 - Reliability Analysis Update 2022 Window 3 p. 21 |
PJM recommended adjustments to Earlier Approved Brandon Shores De-Activation Scope | “Install Statcom at Brighton 500 kV” 500 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation", or when a PJM document prints a rename for the same project (src/ingest/rtepAliases.json; the entry lists its old names).
- role is "new" only where a cited document phrase calls the substation new, describes constructing it, or calls it proposed (graded by src/lib/roleBasis.js), "existing" where a phrase describes work at it, otherwise "unknown".
- expansion is set on a substation that is not "new" where a cited phrase describes a new voltage level, a new or expanded yard, bus or bay, or a named load connected to it (graded by src/lib/expansionBasis.js). It reproduces what the document describes and adds nothing to it.
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.