Red Bank 230 kV substations

Named in 1 PJM planning document for 2 projects, on October 8, 2024.

Existingdescribed as
JCPLzone
230 kVkV as printed
2mentions

Also printed as: Red Bank 230 kV Substations

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Atlantic – Red Bank S1033 230 kV Misoperation Relays
JCPL-2019-008 · s3411.1
Not printed $ 2.0 M 04/17/2026 Not printed 2024-10-08
TEAC
Atlantic – Red Bank T2020 230 kV Misoperation Relays
JCPL-2019-009 · s3412.1
Not printed $ 2.0 M 11/20/2026 Not printed 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named ATLANTIC; RED BANK SUBSTATIONS → ATLANTIC; RED BANK 2024-10-08 Not reported
Substations named ATLANTIC; EATON CREST; RED BANK SUBSTATIONS → ATLANTIC; EATON CREST; RED BANK 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 87
Atlantic – Red Bank S1033 230 kV Misoperation Relays “Replace relaying and limiting substation conductor at Atlantic and Red Bank 230 kV Substations”
230 kV
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 88
Atlantic – Red Bank T2020 230 kV Misoperation Relays “Replace relaying at Atlantic and Red Bank 230 kV substations”
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.