Substation Scout

Elko substation interconnection queue

2 active projects totaling 12.7 MW in the PJM queue.

2 PJM queue filings name Elko as the point of interconnection, all in Henrico County, VA.

Target commercial operation date as filed: Dec 2020 (2 filings).

2active projects
12.7active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AC2-137 Briel Farm Solar 34.5 11.4 Solar In Service Dec 2020
AD2-021 Briel Farm Solar 34.5 1.3 Solar In Service Dec 2020

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Elko” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Other PJM queue substations in Henrico County, VA

All 17 PJM queue filings in Henrico County, VA.