Elko substation interconnection queue
2 active projects totaling 12.7 MW in the PJM queue.
2 PJM queue filings name Elko as the point of interconnection, all in Henrico County, VA.
Target commercial operation date as filed: Dec 2020 (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC2-137 | Briel Farm Solar | 34.5 | 11.4 | Solar | In Service | Dec 2020 |
| AD2-021 | Briel Farm Solar | 34.5 | 1.3 | Solar | In Service | Dec 2020 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Elko” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Elko Substation: Expansion Tracker, PJM planning: APS state not printed
- Elko: Expansion Tracker, PJM planning: DOM state not printed
Other PJM queue substations in Henrico County, VA
- White Oak: 4 active, 119.5 MW of 5 filed
- Darbytown: 4 active, 80 MW of 5 filed
- Spruance NUG: 2 active, 20 MW of 2 filed
- Turner: 1 active, 12 MW of 2 filed