Cloverdale substation interconnection queue
1 active project totaling 250 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Cloverdale as the point of interconnection, all in Botetourt County, VA.
Target commercial operation dates as filed run from Oct 2023 to Apr 2030 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-2044 | Cloverdale 345kV 345 kV | 345 | 250 | Battery | Active | Apr 2030 |
| AG1-155 | Cloverdale 34.5 kV | 34.5 | 8 | Battery | Withdrawn | Oct 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Cloverdale (AEP, 3 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Same name on other Substation Scout pages
Other sources that print a substation named “Cloverdale” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Cloverdale: Expansion Tracker, PJM planning: AMPT state not printed
- Cloverdale: Expansion Tracker, PJM planning: PJM system-wide state not printed
Other PJM queue substations in Botetourt County, VA
- Lexington-Low Moor: 1 active, 10.1 MW of 2 filed
- Cloverdale-Burlington Height: none active of 2 filed