Cloverdale substation interconnection queue

1 active project totalling 250 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
250active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-2044 Cloverdale 345kV 345 kV 345 250 Battery Active
AG1-155 Cloverdale 34.5 kV 34.5 8 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.