Columbia-West Bloomsburg II substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH1-478 Columbia-West Bloomsburg 69 kV II 69 40 Solar Withdrawn
AG2-485 Columbia-West Bloomsburg 69 kV II 69 5 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.