Columbia-Geisinger Tap #1 substation interconnection queue
2 active projects totalling 24 MW in the PJM queue.
2active projects
24active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-433 | Frosty Valley Energy Center | 69 | 12 | Solar | Engineering and Procurement |
| AF2-434 | Frosty Valley Energy Center | 69 | 12 | Solar | Engineering and Procurement |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.