Unity - Rawlings 500 kV
PJM queue ID C01-2197
Unity - Rawlings 500 kV (C01-2197) is listed in the PJM interconnection queue as a 200 MW battery project in Brunswick County, VA. The filing names Unity - Rawlings as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2030.
| Queue ID | C01-2197 |
|---|---|
| Project name | Unity - Rawlings 500 kV |
| Status (as published) | Active |
| Substation | Unity - Rawlings |
| Point of interconnection | Unity - Rawlings 500 kV |
| County | Brunswick |
| State | VA |
| Voltage | 500 kV |
| Capacity | 200 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-06-01 |
| Source dataset | cycle |
Same substation and county
Unity - Rawlings substation: 2 requests in the PJM queue, 1 active totaling 200 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-2198 | Unity - Rawlings 500 kV | 200 | Battery | Withdrawn |
Brunswick, VA: 45 requests in the PJM queue, 18 active totaling 2,685.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Honeybee Energy Storage, LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 200.0 |
| MW capacity | 200.0 |
| MFO | 200.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/12/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.