Substation Scout

Macadamia Solar

PJM queue ID AD1-074

Queue IDAD1-074
Project nameMacadamia Solar
Status (as published)Engineering and Procurement
SubstationTrowbridge
Point of interconnectionTrowbridge 230 kV
CountyWashington
StateNC
Voltage230 kV
Capacity198.8 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2028-03-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy300
Mw Capacity198.8
Mfo300

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.