Substation Scout

Macadamia Solar

PJM queue ID AD1-076

Queue IDAD1-076
Project nameMacadamia Solar
Status (as published)Engineering and Procurement
SubstationTrowbridge
Point of interconnectionTrowbridge 230 kV
CountyWashington
StateNC
Voltage230 kV
Capacity72.2 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2028-03-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy109
Mw Capacity72.2
Mfo484

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.