Macadamia Solar
PJM queue ID AD1-075
Macadamia Solar (AD1-075) is listed in the PJM interconnection queue as a 49.7 MW solar project in Washington County, NC. The filing names Trowbridge as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of March 31, 2028.
| Queue ID | AD1-075 |
|---|---|
| Project name | Macadamia Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Trowbridge |
| Point of interconnection | Trowbridge 230 kV |
| County | Washington |
| State | NC |
| Voltage | 230 kV |
| Capacity | 49.7 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-03-31 |
| Source dataset | serial |
Same substation and county
Trowbridge substation: 5 requests in the PJM queue, 3 active totaling 320.7 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AD1-074 | Macadamia Solar | 198.8 | Solar | Engineering and Procurement |
| AD1-076 | Macadamia Solar | 72.2 | Solar | Engineering and Procurement |
| AF1-073 | Trowbridge 230 kV | 120 | Solar | Withdrawn |
| W3-053 | Trowbridge 230kV | 33.8 | Wind | Withdrawn |
Washington, NC: 21 requests in the PJM queue, 6 active totaling 508.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 75 |
| MW capacity | 49.7 |
| MFO | 375 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.