Macadamia Solar

PJM queue ID AD1-075

Macadamia Solar (AD1-075) is listed in the PJM interconnection queue as a 49.7 MW solar project in Washington County, NC. The filing names Trowbridge as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of March 31, 2028.

Queue IDAD1-075
Project nameMacadamia Solar
Status (as published)Engineering and Procurement
SubstationTrowbridge
Point of interconnectionTrowbridge 230 kV
CountyWashington
StateNC
Voltage230 kV
Capacity49.7 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-03-31
Source datasetserial

Same substation and county

Trowbridge substation: 5 requests in the PJM queue, 3 active totaling 320.7 MW.

Queue IDProjectMWResourceStatus
AD1-074Macadamia Solar198.8SolarEngineering and Procurement
AD1-076Macadamia Solar72.2SolarEngineering and Procurement
AF1-073Trowbridge 230 kV120SolarWithdrawn
W3-053Trowbridge 230kV33.8WindWithdrawn

Washington, NC: 21 requests in the PJM queue, 6 active totaling 508.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy75
MW capacity49.7
MFO375

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.