Turner substation interconnection queue

1 active project totalling 12 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
12active MW
2total filed
Queue IDProjectkVMWResourceStatus
AD1-048 Turner I Solar 34.5 13.3 Solar Withdrawn
AG2-193 Turner 34.5 kV 34.5 12 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.