Substation Scout

Northeast substation interconnection queue

1 active project totaling 8 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Northeast as the point of interconnection, all in Henrico County, VA.

Target commercial operation dates as filed run from Jun 2008 to Oct 2011 (2 filings).

1active projects
8active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
R98 Northeast 34.5kV 34.5 14 Gas Withdrawn Jun 2008
U2-013 Richmond Energy Facility 34.5 8 Gas In Service Oct 2011

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Northeast” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Other PJM queue substations in Henrico County, VA

All 17 PJM queue filings in Henrico County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first