Northeast substation interconnection queue
1 active project totaling 8 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Northeast as the point of interconnection, all in Henrico County, VA.
Target commercial operation dates as filed run from Jun 2008 to Oct 2011 (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| R98 | Northeast 34.5kV | 34.5 | 14 | Gas | Withdrawn | Jun 2008 |
| U2-013 | Richmond Energy Facility | 34.5 | 8 | Gas | In Service | Oct 2011 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Northeast” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Northeast: Expansion Tracker, PJM planning: DOM state not printed
Other PJM queue substations in Henrico County, VA
- White Oak: 4 active, 119.5 MW of 5 filed
- Darbytown: 4 active, 80 MW of 5 filed
- Spruance NUG: 2 active, 20 MW of 2 filed
- Elko: 2 active, 12.7 MW of 2 filed
- Turner: 1 active, 12 MW of 2 filed