Substation Scout

Northeast substation interconnection queue

1 active project totalling 8 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
8active MW
2total filed
Queue IDProjectkVMWResourceStatus
R98 Northeast 34.5kV 34.5 14 Gas Withdrawn
U2-013 Richmond Energy Facility 34.5 8 Gas In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.