Northeast substation interconnection queue
1 active project totalling 8 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
8active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| R98 | Northeast 34.5kV | 34.5 | 14 | Gas | Withdrawn |
| U2-013 | Richmond Energy Facility | 34.5 | 8 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.