Spruance NUG 230 kV
PJM queue ID AH1-108
Spruance NUG 230 kV (AH1-108) is listed in the PJM interconnection queue as a 9 MW gas project in City of Richmond, VA. The filing names Spruance NUG as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2025.
| Queue ID | AH1-108 |
|---|---|
| Project name | Spruance NUG 230 kV |
| Status (as published) | Active |
| Substation | Spruance NUG |
| Point of interconnection | Spruance NUG 230 kV |
| County | City of Richmond |
| State | VA |
| Voltage | 230 kV |
| Capacity | 9 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2025-12-31 |
| Source dataset | cycle |
Same substation and county
Spruance NUG substation: 2 requests in the PJM queue, 2 active totaling 20 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AD2-097 | Spruance Operating Services LLC | 11 | Gas | In Service |
City of Richmond, VA: 6 requests in the PJM queue, 2 active totaling 85.2 MW.
A substation with the same name is named in PJM transmission planning materials: Spruance NUG (DOM, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Spruance Operating Services LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 0.0 |
| MW capacity | 9.0 |
| MFO | 66.0 |
| Submitted date | 8/4/2021 |
| Last updated | 8/20/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.