Whitehouse-Lone Gum substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE1-064 Whitehouse-Lone Gum 138 kV 138 67.3 Solar Withdrawn
AG2-246 Whitehouse-Lone Gum 138 kV 138 0 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.