Bedford, VA interconnection queue

1 active project totalling 5.5 MW in the PJM queue, plus 7 with terminal status (shown greyed).

1active projects
5.5active MW
8total filed
Queue IDProjectkVMWResourceStatus
AH1-368 Cloverdale - Joshua Falls 765 kV 765 83.3 Hybrid Withdrawn
AE1-064 Whitehouse-Lone Gum 138 kV 138 67.3 Solar Withdrawn
AH1-381 Lone Gum - Rockcastle 138 kV 138 59.7 Solar Withdrawn
AE1-130 Meads Store 138 kV 138 55.3 Solar Withdrawn
AG2-311 Smith Mountain 138 kV 138 52.5 Battery Withdrawn
AG2-066 Rockcastle 138 kV 138 12 Solar Withdrawn
AD1-084 Cushaw Hydropower Station 115 5.5 Hydro In Service
AG2-246 Whitehouse-Lone Gum 138 kV 138 0 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.