Bedford, VA interconnection queue
1 active project totalling 5.5 MW in the PJM queue, plus 7 with terminal status (shown greyed).
1active projects
5.5active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-368 | Cloverdale - Joshua Falls 765 kV | 765 | 83.3 | Hybrid | Withdrawn |
| AE1-064 | Whitehouse-Lone Gum 138 kV | 138 | 67.3 | Solar | Withdrawn |
| AH1-381 | Lone Gum - Rockcastle 138 kV | 138 | 59.7 | Solar | Withdrawn |
| AE1-130 | Meads Store 138 kV | 138 | 55.3 | Solar | Withdrawn |
| AG2-311 | Smith Mountain 138 kV | 138 | 52.5 | Battery | Withdrawn |
| AG2-066 | Rockcastle 138 kV | 138 | 12 | Solar | Withdrawn |
| AD1-084 | Cushaw Hydropower Station | 115 | 5.5 | Hydro | In Service |
| AG2-246 | Whitehouse-Lone Gum 138 kV | 138 | 0 | Hybrid | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.