Altavista Solar
PJM queue ID AC1-122
Altavista Solar (AC1-122) is listed in the PJM interconnection queue as a 40.7 MW solar project in Campbell County, VA. The filing names Smith Mountain-Candler's Mountain as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2021.
| Queue ID | AC1-122 |
|---|---|
| Project name | Altavista Solar |
| Status (as published) | In Service |
| Substation | Smith Mountain-Candler's Mountain |
| Point of interconnection | Smith Mountain-Candler's Mountain 138kV |
| County | Campbell |
| State | VA |
| Voltage | 138 kV |
| Capacity | 40.7 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2021-06-01 |
| Source dataset | serial |
Same substation and county
Smith Mountain-Candler's Mountain substation: 2 requests in the PJM queue, 2 active totaling 54.4 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AC1-123 | Altavista Solar | 13.7 | Solar | In Service |
Campbell, VA: 26 requests in the PJM queue, 8 active totaling 2,498.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 60 |
| MW capacity | 40.7 |
| MFO | 60 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.