Roth Rock 138 kV
PJM queue ID C01-1547
Roth Rock 138 kV (C01-1547) is listed in the PJM interconnection queue as a 43.5 MW battery project in Garrett County, MD. The filing names Roth Rock as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 28, 2030.
| Queue ID | C01-1547 |
|---|---|
| Project name | Roth Rock 138 kV |
| Status (as published) | Active |
| Substation | Roth Rock |
| Point of interconnection | Roth Rock 138 kV |
| County | Garrett |
| State | MD |
| Voltage | 138 kV |
| Capacity | 43.5 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-06-28 |
| Source dataset | cycle |
Same substation and county
Roth Rock substation: 2 requests in the PJM queue, 1 active totaling 43.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| N29 | Roth Rock 138kV | 8 | Wind | Withdrawn |
Garrett, MD: 32 requests in the PJM queue, 13 active totaling 1,202.8 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Elawan Energy Appalachia LLC |
|---|---|
| Transmission owner | APS |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 0.0 |
| MW capacity | 43.5 |
| MFO | 50.0 |
| Submitted date | 4/23/2026 |
| Last updated | 11/2/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.