Honeybee Solar, LLC
PJM queue ID AH1-528
Honeybee Solar, LLC (AH1-528) is listed in the PJM interconnection queue as a 180 MW solar project in Brunswick County, VA. The filing names Rawlings - Unity as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2028.
| Queue ID | AH1-528 |
|---|---|
| Project name | Honeybee Solar, LLC |
| Status (as published) | Active |
| Substation | Rawlings - Unity |
| Point of interconnection | Rawlings - Unity 500 kV |
| County | Brunswick |
| State | VA |
| Voltage | 500 kV |
| Capacity | 180 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-12-31 |
| Source dataset | cycle |
Same substation and county
Rawlings - Unity substation: 3 requests in the PJM queue, 1 active totaling 180 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG2-581 | Rawlings - Unity 500 kV | 90 | Solar | Withdrawn |
| C01-1298 | Rawlings - Unity 500 kV | 0 | Solar | Withdrawn |
Brunswick, VA: 45 requests in the PJM queue, 18 active totaling 2,685.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Honeybee Solar Energy, LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 300.8 |
| MW capacity | 180.0 |
| MFO | 300.8 |
| Submitted date | 9/10/2021 |
| Last updated | 8/19/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.