Otter Point LF-1
PJM queue ID M19
Otter Point LF-1 (M19) is listed in the PJM interconnection queue as a 4.5 MW gas project in Baltimore County, MD. The filing names Otter Point as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 1, 2006.
| Queue ID | M19 |
|---|---|
| Project name | Otter Point LF-1 |
| Status (as published) | In Service |
| Substation | Otter Point |
| Point of interconnection | Otter Point |
| County | Baltimore County |
| State | MD |
| Voltage | Not reported |
| Capacity | 4.5 MW |
| Resource (as published) | Methane |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2006-09-01 |
| Source dataset | serial |
Same substation and county
Otter Point substation: 2 requests in the PJM queue, 2 active totaling 8.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| Y2-100 | Eastern Landfill Gas | 4 | Gas | In Service |
Baltimore County, MD: 34 requests in the PJM queue, 5 active totaling 311 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 4.5 |
| MFO | 4.5 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.