Substation Scout

Meadow Lake

PJM queue ID S06

Meadow Lake (S06) is listed in the PJM interconnection queue as a 40 MW wind project in White County, IN. The filing names Olive-DeQuine as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 6, 2009.

Queue IDS06
Project nameMeadow Lake
Status (as published)In Service
SubstationOlive-DeQuine
Point of interconnectionOlive-DeQuine 345kV
CountyWhite
StateIN
Voltage345 kV
Capacity40 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2009-10-06
Source datasetserial

Same substation and county

Olive-DeQuine substation: 2 requests in the PJM queue, 1 active totaling 40 MW.

Queue IDProjectMWResourceStatus
AI2-093Olive-DeQuine 345kV106.5WindWithdrawn

White, IN: 37 requests in the PJM queue, 13 active totaling 770.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy200
MW capacity40
MFO200

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first