Meadow Lake
PJM queue ID S06
Meadow Lake (S06) is listed in the PJM interconnection queue as a 40 MW wind project in White County, IN. The filing names Olive-DeQuine as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 6, 2009.
| Queue ID | S06 |
|---|---|
| Project name | Meadow Lake |
| Status (as published) | In Service |
| Substation | Olive-DeQuine |
| Point of interconnection | Olive-DeQuine 345kV |
| County | White |
| State | IN |
| Voltage | 345 kV |
| Capacity | 40 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2009-10-06 |
| Source dataset | serial |
Same substation and county
Olive-DeQuine substation: 2 requests in the PJM queue, 1 active totaling 40 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AI2-093 | Olive-DeQuine 345kV | 106.5 | Wind | Withdrawn |
White, IN: 37 requests in the PJM queue, 13 active totaling 770.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 200 |
| MW capacity | 40 |
| MFO | 200 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.