Substation Scout

Gibson Solar I

PJM queue ID AF1-114

Gibson Solar I (AF1-114) is listed in the PJM interconnection queue as a 42 MW solar project in King George County, VA. The filing names Oak Grove-Dahlgren as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of December 31, 2028.

Queue IDAF1-114
Project nameGibson Solar I
Status (as published)Engineering and Procurement
SubstationOak Grove-Dahlgren
Point of interconnectionOak Grove-Dahlgren 230 kV
CountyKing George
StateVA
Voltage230 kV
Capacity42 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-12-31
Source datasetserial

Same substation and county

Oak Grove-Dahlgren substation: 3 requests in the PJM queue, 2 active totaling 56.3 MW.

Queue IDProjectMWResourceStatus
AF2-091Gibson Solar I14.3SolarEngineering and Procurement
AI2-080Oak Grove-Dahlgren 230 kV73.4SolarWithdrawn

King George, VA: 17 requests in the PJM queue, 6 active totaling 328 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy100
MW capacity42
MFO100

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.