Gibson Solar I
PJM queue ID AF2-091
Gibson Solar I (AF2-091) is listed in the PJM interconnection queue as a 14.3 MW solar project in King George County, VA. The filing names Oak Grove-Dahlgren as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of December 31, 2029.
| Queue ID | AF2-091 |
|---|---|
| Project name | Gibson Solar I |
| Status (as published) | Engineering and Procurement |
| Substation | Oak Grove-Dahlgren |
| Point of interconnection | Oak Grove-Dahlgren 230 kV |
| County | King George |
| State | VA |
| Voltage | 230 kV |
| Capacity | 14.3 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-12-31 |
| Source dataset | serial |
Same substation and county
Oak Grove-Dahlgren substation: 3 requests in the PJM queue, 2 active totaling 56.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF1-114 | Gibson Solar I | 42 | Solar | Engineering and Procurement |
| AI2-080 | Oak Grove-Dahlgren 230 kV | 73.4 | Solar | Withdrawn |
King George, VA: 17 requests in the PJM queue, 6 active totaling 328 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 34 |
| MW capacity | 14.28 |
| MFO | 134 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.