Substation Scout

Clinton, PA interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 11 with terminal status (shown greyed).

0active projects
0active MW
11total filed
Queue IDProjectkVMWResourceStatus
AA1-111 Renovo Energy Center 230 463 Gas Withdrawn
AF2-411 Mainesburg 345 kV 345 300 Battery Withdrawn
AF1-172 Moshannon-Chapman 230 kV 230 150 Solar Withdrawn
AF1-043 Moshannon-East Towanda 230 kV 230 105 Gas Withdrawn
T162 Lock Haven n/r 63 Coal Withdrawn
AD2-055 Renovo Energy Center 230 35 Gas Withdrawn
AB1-092 Renovo Energy Center 230 17 Gas Withdrawn
Q40 Renovo Lock Haven n/r 8 Wind Withdrawn
AD1-111 Woolrich 12.47 kV 12.5 4.1 Gas Withdrawn
AF2-293 CT-Industrial Park 12.5 0 Hybrid Withdrawn
Q37 Schrack Farms 12 0 Other Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.