Moshannon-East Towanda substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AA1-111 | Renovo Energy Center | 230 | 463 | Gas | Withdrawn |
| AF1-043 | Moshannon-East Towanda 230 kV | 230 | 105 | Gas | Withdrawn |
| AD2-055 | Renovo Energy Center | 230 | 35 | Gas | Withdrawn |
| AB1-092 | Renovo Energy Center | 230 | 17 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.