Tyrell, NC interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).
0active projects
0active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF1-236 | Mackeys 230 kV | 230 | 459.8 | Solar | Withdrawn |
| W3-054 | Mackeys-Riders Creek 115kV | 115 | 19.5 | Wind | Withdrawn |
| Y3-031 | Riders Creek 115kV | 115 | 17 | Wind | Withdrawn |
| AB1-013 | Little Alligator Windfarm | 115 | 16.9 | Wind | Withdrawn |
| Y1-073 | Riders Creek | n/r | 7.6 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.