Riders Creek substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
Y3-031 Riders Creek 115kV 115 17 Wind Withdrawn
AB1-013 Little Alligator Windfarm 115 16.9 Wind Withdrawn
Y1-073 Riders Creek n/r 7.6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.