Riders Creek substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Riders Creek as the point of interconnection, all in Tyrell County, NC.
Target commercial operation dates as filed run from Oct 2016 to Dec 2020 (3 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| Y3-031 | Riders Creek 115kV | 115 | 17 | Wind | Withdrawn | Oct 2016 |
| AB1-013 | Little Alligator Windfarm | 115 | 16.9 | Wind | Withdrawn | Dec 2020 |
| Y1-073 | Riders Creek | n/r | 7.6 | Solar | Withdrawn | Dec 2016 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Tyrell County, NC
- Mackeys: 2 active, 98 MW of 7 filed