Ablemarle Beach Solar
PJM queue ID AA2-178
Ablemarle Beach Solar (AA2-178) is listed in the PJM interconnection queue as a 56 MW solar project in Washington County, NC. The filing names Mackeys as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of April 20, 2021.
| Queue ID | AA2-178 |
|---|---|
| Project name | Ablemarle Beach Solar |
| Status (as published) | In Service |
| Substation | Mackeys |
| Point of interconnection | Mackeys 230kV |
| County | Washington |
| State | NC |
| Voltage | 230 kV |
| Capacity | 56 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2021-04-20 |
| Source dataset | serial |
Same substation and county
Mackeys substation: 7 requests in the PJM queue, 2 active totaling 98 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AE2-034 | Albemarle Beach Solar | 42 | Solar | Partially in Service - Under Construction |
| AF1-236 | Mackeys 230 kV | 459.8 | Solar | Withdrawn |
| AG1-431 | Mackeys 230 kV | 266.2 | Solar | Withdrawn |
| AG1-431A | Mackeys 230 kV | 200 | Battery | Withdrawn |
| AB2-189 | Mackeys 230kV | 84 | Solar | Withdrawn |
| AG2-121 | Mackeys 230 kV | 0 | Battery | Withdrawn |
Washington, NC: 21 requests in the PJM queue, 6 active totaling 508.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 80 |
| MW capacity | 56 |
| MFO | 80 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.