Timber Road IV Wind Farm (Southern Phase)
PJM queue ID AC1-173
Timber Road IV Wind Farm (Southern Phase) (AC1-173) is listed in the PJM interconnection queue as a 9.9 MW wind project in Paulding County, OH. The filing names Logtown as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 31, 2020.
| Queue ID | AC1-173 |
|---|---|
| Project name | Timber Road IV Wind Farm (Southern Phase) |
| Status (as published) | In Service |
| Substation | Logtown |
| Point of interconnection | Logtown 138kV |
| County | Paulding |
| State | OH |
| Voltage | 138 kV |
| Capacity | 9.9 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2020-03-31 |
| Source dataset | serial |
Same substation and county
Logtown substation: 4 requests in the PJM queue, 3 active totaling 59.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG1-369 | Timber Road Solar Park III | 29.9 | Solar | Engineering and Procurement |
| AF2-377 | Timber Road Storage III | 20 | Battery | Engineering and Procurement |
| AI2-092 | Logtown 138 kV | 40.3 | Wind | Withdrawn |
Paulding, OH: 28 requests in the PJM queue, 12 active totaling 250.2 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 75.9 |
| MW capacity | 9.9 |
| MFO | 75.9 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.