Timber Road III

PJM queue ID T131

Timber Road III (T131) is listed in the PJM interconnection queue as a 30 MW wind project in Paulding County, OH. The filing names Lincoln-Sterling as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2017.

Queue IDT131
Project nameTimber Road III
Status (as published)In Service
SubstationLincoln-Sterling
Point of interconnectionLincoln-Sterling 138kV
CountyPaulding
StateOH
Voltage138 kV
Capacity30 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2017-12-31
Source datasetserial

Same substation and county

Lincoln-Sterling substation: 3 requests in the PJM queue, 1 active totaling 30 MW.

Queue IDProjectMWResourceStatus
AI2-102Lincoln-Sterling 138kV46.8WindWithdrawn
AI2-091Lincoln-Sterling 138kV22.7WindWithdrawn

Paulding, OH: 28 requests in the PJM queue, 12 active totaling 250.2 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy150
MW capacity30
MFO150

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.